The VSR 100 MVAr in SS 220/110 kV Mraclin went into initial operation at the construction site. The installation of a 100 MVAr variable shunt reactor is carried out according to the contract between the Croatian Transmission System Operator (HOPS) and Siemens, as part of the European smart grid project SINCRO.GRID.