On Wednesday, 23. September, a 200 MVAr variable shunt reactor was delivered at the construction site (SS 400/220/110 kV Melina). The installation of a 200 MVAr variable shunt reactor is carried out according to the contract between the Croatian Transmission System Operator (HOPS) and Siemens Energy d.o.o., as part of the European smart grid project SINCRO.GRID.