At Substation Pekre, we successfully performed an internal technical takeover for the high-voltage part of the battery energy storage system's investment. The inspection included a new 110 kV TR GIS bay with associated control and protection systems, a 110 kV cable system, and a 110/20 kV transformer. We installed the equipment to connect the battery energy storage system to the transmission network.